                    QC Procedure | 
                 
                 
                  1. Mould Design Control  
                    2. Mould Steel Hardness Inspection  
                    3. Mould Electrodes Inspection  
                    4. Mould Core and Cavity Steel Dimension Inspection  
                    5. Mould Pre-Assembly Inspection  
                    6. Mould Trial Report and Samples Inspection  
                    7. Mould Pre-Shipment Final Inspection  
                    8. Export Mould Package Inspection 
  | 
                 
                 
                   Main 
                    QC Equipment | 
                 
                 
                  CMM Machine 
                     
  | 
                  Optical Projector  
                     
  | 
                 
                 
                  |   | 
                 
               
 |