| 
                 
                  |  Main 
                    QC Procedure |   
                  | 1. Mould Design Control 2. Mould Steel Hardness Inspection
 3. Mould Electrodes Inspection
 4. Mould Core and Cavity Steel Dimension Inspection
 5. Mould Pre-Assembly Inspection
 6. Mould Trial Report and Samples Inspection
 7. Mould Pre-Shipment Final Inspection
 8. Export Mould Package Inspection
 
 |   
                  |  Main 
                    QC Equipment |   
                  | CMM Machine 
 | Optical Projector  
 |   
                  |  |  |